Deck planning guide
Deck permits by town: who to call and what to submit
Every city and township around Plymouth runs deck permits its own way. Some want a zoning permit first. Some need a permit just to replace deck boards. One area sends you to a shared building agency instead of city hall.
This table puts 11 local rules side by side. Each fact comes from the town’s own website or handouts, linked in the table. Where a town doesn’t say, we wrote “Check with the town” instead of guessing.
Last checked: October 21, 2026. Rules and forms change. Always confirm with the building department for your address before work starts.
Call Tanner: 734-259-4649Request an estimate
First, which town are you in?
Your mailing address may not match your city or township. Two common mix-ups:
- Plymouth. The City of Plymouth and Plymouth Township are separate municipalities with separate building departments. The City says its addresses have only three or four digits.
- Belleville. The 48111 ZIP code covers the City of Belleville plus Van Buren and Sumpter townships and a small part of Huron Township. The City says its addresses have only two or three digits, with two named exceptions, and it publishes a list of every City street.
In Northville, the City and the Township also have separate departments. If you’re not sure, call the department you think you’re in and give them your address.
Deck permit rules by town
Scroll sideways to see every column.
| Town | Who issues the building permit | Zoning or plot plan step | Permit to re-board or repair? | What the application asks for | How to apply (official page) | Building department phone |
|---|---|---|---|---|---|---|
| City of Plymouth | City Community Development Department | In the Kellogg Park Historic District, an HDC Certificate of Appropriateness comes first for changes like new decking or railings. Elsewhere: check with the town | Check with the town | Check with the town | In person, by mail, by email or by fax. BS&A Online is listed for other permit types, not decks. Building Department | 734-453-1234, ext. 232 |
| Plymouth Township | Township Building Department | Check with the town | Yes. The Township lists permits for work to “install or repair” decks | Building Permit Application, the Township’s Deck Form, and sketches or other documents showing the work | Call or visit the Building Department. Paper forms are on the Township site. Building Permit page | 734-354-3210 |
| Canton Township | Building & Inspection Services | No separate zoning permit stated. Two plot plans go in with the application so staff can check zoning (25 ft minimum to the rear lot line for an open deck) | Yes, even for boards. Canton lists “any replacement of deck guardrails, deck boards, steps, or structure” | Building permit application, two plot plans, two sets of plans. HOA approval must be obtained before construction | By email or in person. Online filing covers only mechanical, plumbing and select compliance permits. Permits & Applications | 734-394-5200 |
| City of Livonia | City Inspection Department | No separate zoning permit stated. Two plot plans go in with the application | Generally yes. The City says a permit is generally needed to “repair” a structure. Board-only work isn’t addressed | Building permit application, two plot plans, two sets of construction drawings. The forms page has a Deck Form, Deck App Check and Deck Guide | BS&A Online. Residential Forms & Documents | 734-466-2580 |
| City of Northville | City Building Department (Community Development) | In the Historic District, Historic District Commission approval comes before the permit application. All decks must meet Zoning Ordinance Section 18.11.10 | Check with the town | Permit application, a survey showing the deck, easements and meters, and scaled drawings. A flashing detail if the deck attaches to the house | BS&A Online. Deck Permit Guidelines (PDF) | 248-449-9902 |
| Northville Township | Township Building Department | No separate zoning permit stated. Two site plans go in with the application | Not for non-structural repair. The Township lists “deck repair” as not needing a permit “if not structural” | Signed application, two sets of construction drawings, two site plans. HOA rules are the applicant’s responsibility | Check with the town. Deck Checklist and Guide | 248-348-5830 |
| City of Novi | Community Development Department | One combined Building & Zoning Permit Application, with a plot plan and woodland and wetland affidavits | Check with the town | Application, woodland affidavit, wetland affidavit, HOA approval, two complete sets of plans including a plot plan | BS&A Online, after linking an account to the City. Inspections (Online Portal) | 248-347-0415 |
| City of Belleville | City Building Department | No separate zoning permit stated. Two site plans go in with the application | The City says permits are needed for structural changes, and “normal building maintenance typically does not require” one. Board-only work isn’t addressed | Application, two sets of plans, two site plans, HOA or manufactured home community approval | Contact the Building Clerk. Forms are on the City page. No online portal listed. Building & Zoning | 734-697-9323, ext. 7015 |
| Van Buren TownshipMany Belleville addresses | Township Building Department | Check with the town | Check with the town | Check with the town | BS&A Online or downloadable forms. Permits that need plan review are handled during office hours, Monday to Thursday. Municipal Services FAQ | 734-699-8913 |
| City of ChelseaC.A.C.A. also serves Dexter, Lima, Lyndon and Sylvan townships | Chelsea Area Construction Agency (C.A.C.A.), not the City or Washtenaw County | Yes. Get a zoning permit from the City (or your township) first, then contact C.A.C.A. | Check with the town | Zoning compliance permit, two sets of scaled plans signed or stamped by the zoning official, two site plans and the application. Environmental Health approval “can be required” for a deck | In person, or ask C.A.C.A. about electronic submittals. Permit information | C.A.C.A. 734-475-4420. City zoning: 734-475-1771, option 5 |
| Ypsilanti Township | Township Building Department | No separate zoning permit stated for decks. A to-scale plot plan goes in with the building application | Check with the town | Building permit application, to-scale plot plan, two sets of plans. Deck rules are in the Township’s Residential Deck Plan Review Checklist | By email or in person. Building Department | 734-544-4000, ext. 1 |
Rules that apply everywhere in Michigan
Every town above enforces the state’s residential code. The current one is the 2015 Michigan Residential Code, in effect since February 8, 2016.
- Footings go 42 inches deep. Michigan’s rule says all exterior footings must extend 42 inches below grade. The building official can change that based on local conditions. Some towns treat freestanding decks differently, so ask. (Mich. Admin. Code R 408.30522)
- Guards above 30 inches. A deck surface more than 30 inches above grade needs a guard at least 36 inches high. Openings can’t let a 4-inch sphere pass through. (AWC deck guide DCA 6; Canton, Novi and Ypsilanti Township deck handouts)
- Handrails on stairs with 4 or more risers. The handrail sits 34 to 38 inches above the stair nosing. (Canton and Ypsilanti Township deck handouts)
- No ledger on brick veneer. A deck can’t hang from brick veneer, a cantilevered floor or a bay window. Those decks need their own support. (AWC DCA 6; Novi and Belleville deck sheets)
- Call MISS DIG 811 before digging. Michigan law requires utility lines to be marked before any excavation, including footing holes. Don’t dig before the start time on your ticket. (MISS DIG 811)
These are highlights, not the whole code. Your town’s handout and plan review set the details. For what to look for on an older deck, see the deck replacement guide.
Deck permit questions
Do I need a permit to replace deck boards?
It depends on the town. Canton says yes, even for boards. Plymouth Township lists deck repair as permit work. Northville Township says non-structural deck repair doesn’t need a permit. Many towns don’t say, so call before you start.
My address says Plymouth or Belleville. Which office do I call?
Check your house number and street first. City of Plymouth addresses have three or four digits. City of Belleville addresses have two or three digits, with two exceptions. Longer numbers usually mean a township.
Is HOA approval the same as a permit?
No. They’re separate. Canton says it doesn’t require HOA approval before it issues a permit, but you must get it before construction. Novi and Belleville ask for HOA approval with the deck application.
Why does Chelsea send me to a different office?
The City of Chelsea and the townships of Dexter, Lima, Lyndon and Sylvan share one building agency, C.A.C.A. In the City, you get a zoning permit first, then apply to C.A.C.A. for the building permit.
How deep do deck footings need to be in Michigan?
42 inches below grade, unless the building official approves otherwise. Canton, Livonia, Northville and Belleville all list 42 inches in their deck handouts.
Can I start digging once I have the permit?
Call MISS DIG 811 first and wait for the start time on your ticket. Most towns also inspect the post holes before concrete goes in.
Share this table
Realtors, HOA boards and property managers: you’re welcome to share this page with clients and residents. Please link to it instead of copying the table, so readers always see the latest check. Suggested link text: “Deck permit rules by town (Brewers Homes)”.
Spot something out of date? If you work for one of these towns, or a rule has changed, email [email protected] or call 734-259-4649. We’ll re-check it against the official source and update the date.
Keep planning
Planning a deck in one of these towns? Brewers Homes builds and repairs decks, covered porches and stairs within one hour of Plymouth, Michigan. Call or text Tanner at 734-259-4649, or send the estimate form. Tell us your city or township and what you’d like to build or fix.
Request an estimate734-259-4649