Brewers HomesDecks & covered porches

Brewers Homes / Decks & covered porches / HOA approval

Deck and porch planning guide

HOA approval for a deck or porch: what to prepare

Quick answer: HOA approval and the building permit are separate. Some towns, like Novi, list HOA approval among the deck permit items. Others, like Canton, issue the permit without it but say HOA approval must be in place before construction. Either way, read your association’s rules and have its approval before any work starts.

Your city or township checks a deck or porch against the building code and its zoning rules. A homeowners association, if you have one, checks it against the association’s own rules. One doesn’t replace the other. This guide shows how a few Michigan towns handle HOA approval on their official deck pages, and what to gather before you ask either one.

Call Tanner: 734-259-4649Request an estimate

Finished front porch on a blue-sided Novi home with white columns and skirting
Front porch by Brewers Homes, Novi

Is HOA approval the same as a building permit?

No. Canton’s building permit application says the township doesn’t require HOA approval before issuing residential permits, that all necessary HOA approvals must be in place before any construction, and that it won’t refund a permit that is reviewed, issued and then cancelled because of HOA requirements.

The same application warns that a property may have deed restrictions that don’t permit a project, and says to check the title for deed restrictions and covenants.

Which comes first: HOA approval or the city permit?

It depends on the town. Examples from official deck pages:

TownWhat its deck page says about HOA approval
City of NoviLists homeowner association approval among the items to submit for a deck permit, with builder approval if the association isn’t active yet.
Canton TownshipDoesn’t require HOA approval before issuing the permit, but HOA approval, if applicable, must be obtained before construction.
Bloomfield TownshipIts deck plan review checklist includes an item asking for subdivision association comments on the site plan and elevations presented for plan review.

One order fits every rule above: HOA approval first, then the permit application, then construction. In a town that asks for HOA approval with the application, that order keeps the paperwork complete. In a town that doesn’t, the HOA still has to sign off before work starts.

In a historic district, another approval can come first. The City of Northville says decks in its Historic District need Historic District Commission approval before the permit application. Our deck permits by town table notes a similar step in the City of Plymouth’s Kellogg Park Historic District.

What does an HOA want to see?

Each association sets its own rules, so ask yours for its review form or guidelines. The town deck sheets show the documents that are useful for both reviews:

  • A plot plan. Novi wants the size and location of all new construction and existing structures, with distances from lot lines and easements. Canton wants the distances to the rear and side lot lines and the overall deck size.
  • Setbacks. Canton sets a 25-foot minimum to the rear lot line for an open deck, and says raised decks over four feet high or decks with a roof must meet the home’s rear yard setback. Novi limits how far a deck can project into each setback, and notes that some subdivisions have different setbacks because of deed restrictions.
  • Drawings. Novi asks for a framing plan, an elevation and a cross section. Bloomfield Township’s checklist lists front, side and rear elevations.
  • Height. Novi asks for the deck height above grade, and Canton for the overall height from the ground to the deck surface.
  • Materials and colors. Canton’s plans must show the decking material. If your HOA reviews appearance, ask whether it wants product names, color names or samples for the decking, railings and trim.

What should I gather before asking the HOA?

  • Your association’s deed restrictions, covenants and any architectural guidelines.
  • The HOA’s review form, who receives it, and how long its review usually takes.
  • A survey or plot plan showing the deck or porch, the lot lines and the easements.
  • The deck or porch size, its height above the ground, and its distance to each lot line.
  • A simple drawing of each side that will be visible.
  • Decking, railing and trim material names and colors.
  • Photos of the yard and of the house wall where the deck or porch will meet the house.
  • The building department for your address, from our permit table.

Our guide to preparing for a deck estimate covers the photos and documents that help in a first conversation, including any survey, plot plan or known property restrictions.

What if my HOA isn’t active yet?

In a newer subdivision, Novi’s deck sheet asks for builder approval if the association isn’t active yet. Other towns may handle this differently, so ask your building department what it accepts.

Questions people ask

Do I need HOA approval before getting a deck permit?

It depends on the town. Novi lists HOA approval among its deck permit items. Canton issues the permit without it, but says HOA approval must be obtained before any construction. Check your town’s deck sheet.

Is HOA approval the same as a building permit?

No. They’re separate reviews. The town checks the building code and its zoning rules, and the association checks its own rules. Canton says it won’t refund a permit that is cancelled because of HOA requirements.

What does an HOA need to see for a deck?

Ask your association for its form. Town deck sheets ask for a plot plan with distances to lot lines and easements, the deck size and height, and drawings. Have decking, railing and color names ready in case your HOA reviews appearance.

What if my subdivision’s HOA isn’t active yet?

Novi’s deck sheet asks for builder approval if the association isn’t active yet. Other towns may handle it differently, so ask your building department.

Can deed restrictions stop a deck?

They can. Canton’s permit application warns that a property’s deed restrictions may not permit a project and says to check the title for deed restrictions and covenants. Novi notes that some subdivisions have different setbacks because of deed restrictions.

Does a historic district need its own approval?

In some towns, yes, and it comes first. The City of Northville says decks in its Historic District need Historic District Commission approval before the permit application. Our permit table notes a similar step in the City of Plymouth.

Sources

Checked: Nov 2026

Rules and product instructions change. Confirm with your building department and the care guide for your exact product.

Text a photo of your yard to 734-259-4649 and Tanner will take a look.

Request an estimate734-259-4649