Quick answer: Michigan’s residential code says exterior footings must extend 42 inches below grade, and the building official can change that for local conditions. Deep footings keep posts below the soil that freezes and heaves. Most towns we checked inspect the holes before concrete goes in, and some treat freestanding decks differently, so check with your building department first.
This guide explains Michigan’s footing rule, why it exists, and what footings look like at a homeowner level. It isn’t a design guide. Footing size depends on the deck, the soil and your town’s plan review.
Call Tanner: 734-259-4649Request an estimate

What does Michigan’s code say about footing depth?
Michigan amends the model code’s footing-depth section. Rule R 408.30522 says all exterior footings and foundation systems must extend 42 inches below actual grade.
The building official can modify that depth on evidence of:
- Freezing temperatures (freezing degree days).
- Soil type.
- Ground water conditions.
- Snow depth experience.
- Exposure to the elements.
- Other specific conditions the building official identifies.
LARA’s Bureau of Construction Codes lists the 2015 Michigan Residential Code as the current residential code, effective February 8, 2016. Local deck handouts repeat the 42-inch figure, including Canton’s, Livonia’s, Novi’s and the City of Northville’s.
Why does frost depth matter?
Frost heave lifts what’s built on frozen soil. The USDA’s National Soil Survey Handbook says frost heave comes from ice lenses that form in the soil. It takes freezing temperatures, soil moisture and susceptible soil. Water moves toward the ice and freezes onto it, so the lenses keep growing. Generally, the more slowly and deeply the frost goes in, the thicker the lenses and the greater the heave.
Thaw weakens the soil. The handbook says thawing ice lowers the surface and reduces soil strength. It says frost heave is less of a problem for buildings with footings below the depth of frost penetration, while driveways, patios and sidewalks can heave and crack.
Soil type changes the risk. Soils high in silt and very fine sand are the most prone, the handbook says. Sandy soils are less so, and clay soils form ice lenses mainly when the frost moves in slowly.
Snow cover plays a part in Michigan. A 1998 study of southern Michigan soils by Isard and Schaetzl found that 3 to 5 freeze-thaw cycles a year are typical in eastern and southeastern southern Michigan, and that soils rarely freeze where deep snow builds up, even in the coldest winters.
What do deck footings look like?
A footing is the concrete base at the bottom of the hole, and the post sits on it. The American Wood Council’s deck guide (DCA 6), whose drawings Livonia’s deck guide reproduces, shows a few typical options:
- A concrete footing up to grade, with a metal post base and anchor on top.
- A wide concrete pad with a round stem. A 12-inch concrete stem rises from the pad to a metal post base.
- A post set down on the footing pad in the hole, with the cut end treated with an approved preservative.
DCA 6 also says:
- Footings bear on undisturbed soil at least 12 inches below the ground surface or below the frost line, whichever is deeper.
- Posts are centered on their footings, and pre-made post anchors are galvanized or stainless steel.
- Footings don’t go over septic systems, leach fields, utility lines or enclosed meters.
- Footing size comes from its tables, based on the load each post carries and the soil.
Near the house, footings often go deeper. DCA 6 and Livonia’s deck guide say footings closer than 5 feet to the house foundation wall must bear at the same elevation as the house footing. Novi says posts in the backfill area of the house must be dug to the depth of the house footings.
Before any digging, Michigan law requires utility lines to be marked through MISS DIG 811.
What gets inspected?
Every town below lists a post hole or footing inspection before the hole is filled. As examples from their deck handouts:
- Canton: a post hole inspection and a final building inspection for all deck construction.
- Livonia: a post hole and ledger board inspection before concrete, an open joist inspection on decks with less than 4 feet between the joists and grade, and a final. The inspector needs access inside the house to check the ledger, and an adult must be there.
- Novi: inspections of the exposed 42-inch-deep post hole and of the completed deck. Skirting goes on only after final approval.
- City of Northville: a post hole inspection and a final.
- Ypsilanti Township: a footing inspection after the holes are dug and cleaned out, before anything goes in them, a rough framing inspection in some cases, and a final.
DCA 6 adds that the building official verifies bearing conditions in the field before concrete is placed, and that a deck shouldn’t be used until final inspection and approval.
What if my town has its own rules?
The 42-inch rule is statewide, but the details vary:
- Freestanding decks. Ypsilanti Township’s 2025 deck checklist says decks not attached to the house don’t need footings that extend below frost, citing an exception in the code (R403.1.4, exception 6). Its footings for attached decks go 42 inches. Michigan’s rule says all exterior footings, so ask your building department before planning a shallow footing.
- Local conditions. The building official can change the depth for soil, ground water and the other conditions listed above.
- What goes on the plans. Novi asks for the foundation depth and post hole diameter. The City of Northville asks for post hole locations, spacing and the 42-inch minimum depth.
Our deck permits by town table lists the building department, phone number and application items for 11 local towns. Check the one for your address before planning footings. After a hard winter, our spring deck safety check covers posts and footings.
Questions people ask
How deep do deck footings need to be in Michigan?
Michigan’s residential code says all exterior footings must extend 42 inches below actual grade. The building official can change that based on conditions like freezing temperatures, soil type or ground water, so confirm with your building department.
Why do deck footings have to go below the frost line?
To sit below the soil that freezes and heaves. The USDA says frost heave happens when ice lenses form in moist, susceptible soil, and that it’s less of a problem for footings that extend below the depth of frost penetration.
Do freestanding decks need 42-inch footings?
It depends on the town. Ypsilanti Township’s checklist says decks not attached to the house don’t need footings below frost, but Michigan’s rule covers all exterior footings unless the building official modifies it. Ask your building department.
When is the footing inspection for a deck?
Usually after the holes are dug and before concrete goes in. Canton, Livonia, Novi, the City of Northville and Ypsilanti Township all list a post hole or footing inspection. Livonia also checks the ledger at that visit.
Do deck footings near the house need to be deeper?
Often. The American Wood Council’s deck guide and Livonia say footings closer than 5 feet to the house foundation wall must bear at the same elevation as the house footing. Novi says posts in the backfill area must reach the depth of the house footings.
Do utility lines need to be marked before digging footings?
Yes. Michigan law requires utility lines to be marked before any excavation, and MISS DIG 811 is the state’s utility notification system. Footing holes are excavation, so have the lines marked first.
Sources
Checked: Nov 2026
Rules and product instructions change. Confirm with your building department and the care guide for your exact product.
- Mich. Admin. Code R 408.30522, minimum depth (Cornell LII): https://www.law.cornell.edu/regulations/michigan/Mich-Admin-Code-R-408-30522
- Michigan LARA, Bureau of Construction Codes, Code Books: https://www.michigan.gov/lara/bureau-list/bcc/rules-acts/codes/code-books
- USDA NRCS, National Soil Survey Handbook, Part 618 Subpart A, 618.34 Frost Action, Potential (amended Aug 2024, PDF): https://directives.nrcs.usda.gov/sites/default/files2/1725389482/Part%20618%20Subpart%20A%20%E2%80%93%20General%20Information.pdf
- Isard and Schaetzl, Effects of winter weather conditions on soil freezing in southern Michigan, Physical Geography 19(1), 1998 (abstract): https://pure.psu.edu/en/publications/effects-of-winter-weather-conditions-on-soil-freezing-in-southern/
- American Wood Council, Prescriptive Residential Wood Deck Construction Guide (DCA 6, PDF): https://web-media.awc.org/wp-content/uploads/2022/02/17210514/AWC-DCA62015-DeckGuide-1804.pdf
- City of Livonia, Deck Guide (PDF): https://livonia.gov/DocumentCenter/View/2999/Deck-Guide-PDF
- Canton Township, Applying for a Residential Deck Permit (PDF): https://www.cantonmi.gov/DocumentCenter/View/167/Deck-Permit-Application-PDF
- City of Novi, Residential Deck Requirements (PDF): https://unoviprod.muniweb.com/media/bj4l4rwl/bldg-deckrequirements.pdf
- City of Northville, Deck Permit Guidelines (PDF): https://www.cityofnorthvillemi.gov/DocumentCenter/View/255/Deck-Permit-Guidelines-PDF
- Ypsilanti Township, Residential Deck Plan Review Checklist (updated May 9, 2025, PDF): https://ypsitownship.org/Documents/Departments/Building/Forms-Documents/Residential-Deck-Plan-Review-Checklist-2025-05.pdf
- MISS DIG 811: https://missdig811.org/
- Brewers Homes, Deck permits by town (last checked Oct 21, 2026): https://brewershomes.com/resources/deck-permits-by-town
Text a photo of your yard to 734-259-4649 and Tanner will take a look.